cancun_ecocabins.jpg
DSC05278.jpg
DSC05289.jpg
2.4-CANCUN-2.jpg

Cancún 2: 76.10 m2

  • THE BUILDING INCLUDES
  • OPTIONAL EQUIPMENT
  • ECOTECHNOLOGIES
  • TIME OF CONSTRUCTION
  • PAYMENT METHODS
  • Construction with perimeter walls 2.50 and 3.00 m height and interior walls 2.40 m height, all with intermediate thermo-acoustic insulation.

  • Mezzanine above bathroom and hall area (access thru secondary bedroom).

  • All indoor facilities left at the foot of the building (electrical, hydraulic, sewage).

  • Walls in shower area finished with cement panel, ready for tiles setting.

  • Bathroom furniture (sink with pedestal, dual flush toilet, shower accessories).

  • Aluminum windows, including mosquito screens.

  • Roof finished with asphalt shingles and insulation.

  • Walls finishes according to the following options:

    • Outdoors with vinyl paint or linseed oil

    • Indoors with wood sealer

  • Foundation according to the following options:

    • 8 cm concrete slab, reinforced with electro-welded mesh, floated finish, ready to set ceramic tiles or wooden floor. 

    • Elevation with stilts (palafites) and wooden floor, finished on stave floor with acrylic treatment for wood.

  • Tiles in shower area

  • Sink cabinet

  • Closet

  • Wooden kitchen

If your land does not have general services (water, drainage, electric power), we provide you alternatives as:

  • Water well

  • Wooden tower with water tank

  • Underground water tank

  • Waistewater treatment plant

  • Solar panels

  • 25 days with concrete slab.

  • 30 days with elevation with stilts.

  1. 50% down payment upon the signing of the contract, 25% at the beginning of the construction and the last 25% at the end of the works.

  2. 25% down payment upon the signing of the contract, 25% 10 days before the start of construction and the remaining 50% divided into weekly payments during the construction process.

  3. Credit card (Visa, Mastercard)

  4. Credit for up to 10 years at a rate of 11% per year

The cost depends on the location and characteristics of the land, as well as the characteristics selected for the model.